Case Study – Renewable Integration project
A worldwide client with operations in Romania has a network of several hundred locations focusing on renewable energies: wind farms, PV solar parks, and cogeneration. These locations required multi-path communication.
Challenges:
- Managing multi-vendor equipment running different SCADA protocols
- Maintaining compliance with changing regulation framework
- Geographical distribution of assets (PV solar parks, wind farms, cogeneration)
Objectives:
- Data extraction, aggregation, processing, and storage
- SCADA gateway to the OT command centre and customer’s IT systems.
- Integrated app management, network connectivity, and GPS localization.
Business Solution:
- Eximprod ES200 virtual RTU
- Industrial and IoT protocols
- Cisco Fog Director
Business Benefits:
- One single SCADA for more than 1.000 MW from 40 wind farm and PV plants
- Integration of operation, maintenance, asset management, wind farm security monitoring systems, and forecasting systems
- Advanced cybersecurity deployed in OT
Eximprod Solution:
The proposed solution is Eximprod’s ES200 – a Virtual Remote Terminal Unit that runs on the Cisco IR809 IOx platform. ES200 deploys and adds new features much more rapidly and without hardware replacement. Security features and custom business logic can now be implemented based on customer requirements.
ES200 enabled the customer to improve grid security, reliability, and efficiency by integrating information and operational technologies (IT& OT).
ES200 can run and deploy at the Network Edge, while securely isolating SCADA microservices from any other process.
Also, together with the Cisco IOx, it offers advanced functions such as integrated app management, network connectivity, and GPS localization.
For more details, please check the video:
https://www.youtube.com/watch?v=Yf08nEgUm3I
Case Study – Distribution Automation project for DSO
The Distribution System Operator – a leading distributor and supplier of electricity in Romania- required to create and implement the backbone of modernization to a fully digitized utility: for remote automation, distribution control, and IoT for security and resilience. The solution should manage both the legacy and the next generation components that make up today’s evolving smart grid.
Challenges:
- Increase IT & OT efficiency and security
- Improve grid reliability and control
- Reduce the number of service interruptions
Objectives:
- Virtual SCADA System
- Distribution Automation with Network-Embedded Microservices
- IoT Security
Business Solution:
- Eximprod ES200 virtual RTU
- Cisco IOx IR809 Industrial Integrated Services Router
- Cisco Fog Director
Business Benefits:
- Connected existing and new smart grid automated control for Utility distribution systems operators
- Ensured ease of management for SCADA using the Cisco Fog Director
- Advanced cybersecurity deployed in OT
Eximprod Solution:
Eximprod deployed a solution consisting in using Digital Smart Grid applications including:
- Virtualized SCADA System: ES200, virtual Remote Terminal Unit, for Energy Distribution Automation running on Cisco IOx IR809 router
- Distribution Automation with Network-Embedded Microservices: securely connecting existing and new Smart Grid automated control of secondary substations
- IoT Security- SCADA platform runs as a microservice directly on the Cisco IoT Secure Gateway
This solution allowed the DSO
- modernize and add software and services for remote automation and increased distribution control
- real-time visibility of the business – enables a quick response
- a secure, stable and very predictable network
- reduced and controllable cost base
References for Products and equipment
Product range | Key customers |
---|---|
High Voltage and Medium Voltage clamps |
![]() ![]() |
Low Voltage and Medium Voltage Distribution Boxes and Cabinets |
![]() ![]() |
Composite post insulators |
![]() |
Dead-end insulators |
![]() ![]() ![]() ![]() |
Railway insulators |
![]() ![]() ![]() ![]() ![]() ![]() |
Medium Voltage surge arresters; Outdoor medium voltage disconnectors |
![]() ![]() ![]() ![]() |
Outdoor medium voltage disconnectors |
![]() ![]() ![]() ![]() |
Medium voltage fuses |
![]() ![]() ![]() ![]() ![]() |
110-400 kV long rod insulators |
![]() ![]() |
110 kV station post insulators |
![]() ![]() |
123 kV disconnectors |
![]() ![]() |
References - Energy Automation and Smart Grid
Project | Clients |
---|---|
Automation of Distribution :
Integrated SCADA DMS System :
|
![]() |
Automation of Distribution Dispatch in Bacau (incl 40 remote-controlled equipment)
E.ON SCADA training Centre in SuceavaSCADA EMS/DMS pilot project
Supply and integration of 400+ remote-controlled Eximprod MV overhead switchesSCADA Implementarion in 21 HV/MV Substations (ongoing) |
![]() |
Automation of 15 secondary distribution substations70 remote controlled overhead switches |
![]() |
Automation of Distribution Dispatch (Bucharest Area)Aprox 70 equipment integrated |
![]() |
Cogeneration Plant Dispatch which integrates the data from
Security/ Outdoor Lighting System |
![]() |
Software and equipment for overhead switch automation |
![]() |
Engeering Services for Lygurio Substation, Greece (ongoing)
SCADA Equipment |
![]() |
SCADA and Telecomunications System for Independenta 400 kV Substation (ongoing) |
![]() |
SCADA System for Corni 70 MW Wind Park |
![]() |
References for Renewables
Type | Project Name | Sponsoring Company | Installed capacity | County | Status |
---|---|---|---|---|---|
Eolian | |||||
Ecoprod Energy | ENEL Green Power | 9 MW | Tulcea | Built in 2012 | |
Total Electric | ENEL Green Power | 15 MW | Tulcea | Built in 2012 | |
Gebeleisis 70 | Global Wind Power | 70 MW | Galati | Built in 2012 | |
Gebeleisis 50 | GDF SUEZ ENERGY | 5 x 10 MW | Galati | Built in 2013 | |
Gebeleisis 78 | 78 MW | Galati | Under Development | ||
Gebeleisis 66 | 66 MW | Galati | Under Development | ||
Gebeleisis 57 | 57 MW | Galati | Under Development | Fotovoltaic | |
Gebeleisis 8 | GDF SUEZ ENERGY | 5 MWp | Buzau | Built in 2013 | |
Gebeleisis 9 | MARCHY-SYNERGO | 5.57 MWp | Buzau | Built in 2013 | |
Gebeleisis 7 | Solar Development Project | 65 MWp | Prahova | Ready to Build | Co-Generation |
Ecogen Energy | Ecogen Energy | 6 MWel | Buzau | Built in 2009 |
References for Dispatch
Type of Service | Client |
---|---|
Dispatch Services for Corni 70 MW Wind Farm |
![]() |
Dispatch Services for 50 MW Baleni 50 MW Wind Farm
Dispatch Services for 48,3 MW Gemenele Wind Farm |
![]() |
Dispatch Services for 16 MW ALLIANSO PARK MANAGEMENT Photovoltaic Power Station |
![]() |
Dispatch Services for 9,43 MW Costestii din Vale Photovoltaic Power Station
Local Operation, Preventive Maintenance and Corrective Maintenance for 9,43 MW Costestii din Vale Photovoltaic Power Station
Dispatch Services for 1 and 2, 2 x 2.55MW Dumbrava
Local Operation, Preventive Maintenance and Corrective Maintenance for 1 and 2, 2 x 2.55MW Dumbrava Photovoltaic Power Station |
![]() |
Dispatch Services for 3, 9.5MW Aricestii Rahtivani Photovoltaic Power Station |
Varokub Energy Development |
Dispatch Services for Stalpu 1 and 2, 2 x 2.5 MW Photovoltaic Power Station
Local Operation, Preventive Maintenance and Corrective Maintenance for Stalpu 1 and 2, 2 x 2.5 MW Photovoltaic Power Station
Power connection testing and certification of the technical compliance according to ANRE Order 74/2013 |
Solar Development Project |
Dispatch Services for 2 MW Slobozia Conachi Wind Farm
Local Operation for 2 MW Slobozia Conachi Wind Farm |
Three Wings |
References for Turnkey Projects
Denumire Proiect | Faza | Client |
---|---|---|
Modernizare și integrare în SCADA a stației de transformare 110/20 kV Pătârlagele | Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord | |
Stație de Transformare și lucrări electrice pentru Parcul Eolian Corni, putere instalata de 70 MW | Global Wind Power / Vestas CEU | |
Extindere Stația de Transformare 110/20 kV Cudalbi (jud. Galati) | PT +DE +Execuție | FDEE Electrica Distribuție Muntenia Nord – SDEE Galați |
Stație de Conexiuni 110 kV Baleni (jud. Galati) | PT +DE +Execuție +As Built | FDEE Electrica Distribuție Muntenia Nord – SDEE Galați |
Centrala Electrica Fotovoltaica SP1 2,5MW (jud. Buzău) | PT +DE +As Built | Solar Consult & Development Project SRL |
Racordarea la RED a C.E.F. SC1 si SC2 (2x 2,5MW) (jud. Buzău) | Studii de Sistem | Solar Consult & Development SRL |
Rețele electrice de distribuție internă C.E.E. 50MW Baleni (jud. Galati) | PT +DE +Execuție +As Built | Viarom Construct SA |
Analiza circulațiilor de puteri și a necesarului de putere reactivă CEF: 2,95MW SEZ Trade & Descrierea măsurilor de protectie împotriva funcționării insularizate a C.E.F.N.D. SEZ Trade (jud. Bihor) | Studii de Sistem | SEZ TRADE |
Lucrări electrice pentru evacuare putere produsă de C.E.E. Corni 70MW (LES 110 kV l= 7,9km, Stație de Transformare 110/30 kV, Retea Electrica 30 kV de Distribuție internă Parc) (jud. Galati) | PT +DE +Execuție +As Built | VESTAS CEU |
Proiectare si executie lucrari electrice "Racordare la SEN a CEE Baleni: reconductorare LEA 110 kV Smarda-Bujoru prin montare de conductor HTLS si LEA 110 kV noua dublu circuit" | PT +DE +Execuție +As Built | Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord |
Racordare la RED 7 centrale electrice fotovoltaice cu puterea totala de 65 MW (5×9,9 MW + 1×9,2 MW + 1×6,3 MW) din comuna Ciorani, judetul Prahova | PT+CS | Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord |
Sistem SCADA DMS incluzand 4 centre DMS si modernizarea a 21 stații de transformare: Stația IT/MT Azuga , Stația IT/MT Vega, Stația IT/MT Comarnic, Stația IT/MT Baltesti, Stația IT/MT Tatarani, Stația IT/MT Valea Voievozilor, Stația IT/MT IUP, Stația IT/MT Butimanu, Stația IT/MT Romlux, Stația IT/MT Valea Voievozilor, Stația IT/MT Hipodrom, Stația IT/MT Zatna, Stația IT/MT Lebada, Stația IT/MT Lunca, Stația IT/MT Tecuci, Stația IT/MT Uzina de Apa, Stația IT/MT Pechea, Stația IT/MT Beresti, Stația IT/MT Teis, Stația IT/MT Aninoasa, | PT+CS | Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord |
Proiectare și execuție lucrări electrice pentru evacuare putere din Parc Eolian Corni-70MW ( LES 110 kV, Stație transformare 110/30 kV, Rețea 30 kV Parc Eolian Corni) | PT +DE +Execuție +As Built | Global Wind Power / Vestas CEU |
Rețea de comunicatie FO (trei inele de fibra optica interconectate) | PT+DE | E.ON Moldova Distributie SA |
Sistem EMS/DMS-SCADA E.ON Moldova – Proiect Pilot Modernizarea a 25 IT/MT stații de transformare: Stația IT/MT Moinești, Stația IT/MT Vatra Dornei, Stația IT/MT Targu Neamț, Stația IT/MT Regie, Stația IT/MT Săveni, Stația IT/MT Pașcani, Stația IT/MT Delea, Stația IT/MT Rădăuți, Stația IT/MT Trușești, Stația IT/MT Izvoare, Stația IT/MT Solca, Stația IT/MT Dorohoi, Stația IT/MT Targu Ocna, Stația IT/MT Șișcani, Stația IT/MT Comănești | PT+DE+Execuție | E.ON Moldova Distribuție SA |
Project Name | Phase | Client |
---|---|---|
Modernizare și integrare în SCADA a stației de transformare 110/20 kV Pătârlagele | Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord | |
Stație de Transformare și lucrări electrice pentru Parcul Eolian Corni, putere instalata de 70 MW | Global Wind Power / Vestas CEU | |
Extindere Stația de Transformare 110/20 kV Cudalbi (jud. Galati) | PT +DE +Execuție | FDEE Electrica Distribuție Muntenia Nord – SDEE Galați |
Stație de Conexiuni 110 kV Baleni (jud. Galati) | PT +DE +Execuție +As Built | FDEE Electrica Distribuție Muntenia Nord – SDEE Galați |
Centrala Electrica Fotovoltaica SP1 2,5MW (jud. Buzău) | PT +DE +As Built | Solar Consult & Development Project SRL |
Racordarea la RED a C.E.F. SC1 si SC2 (2x 2,5MW) (jud. Buzău) | Studii de Sistem | Solar Consult & Development SRL |
Rețele electrice de distribuție internă C.E.E. 50MW Baleni (jud. Galati) | PT +DE +Execuție +As Built | Viarom Construct SA |
Analiza circulațiilor de puteri și a necesarului de putere reactivă CEF: 2,95MW SEZ Trade & Descrierea măsurilor de protectie împotriva funcționării insularizate a C.E.F.N.D. SEZ Trade (jud. Bihor) | Studii de Sistem | SEZ TRADE |
Lucrări electrice pentru evacuare putere produsă de C.E.E. Corni 70MW (LES 110 kV l= 7,9km, Stație de Transformare 110/30 kV, Retea Electrica 30 kV de Distribuție internă Parc) (jud. Galati) | PT +DE +Execuție +As Built | VESTAS CEU |
Proiectare si executie lucrari electrice “Racordare la SEN a CEE Baleni: reconductorare LEA 110 kV Smarda-Bujoru prin montare de conductor HTLS si LEA 110 kV noua dublu circuit” | PT +DE +Execuție +As Built | Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord |
Racordare la RED 7 centrale electrice fotovoltaice cu puterea totala de 65 MW (5×9,9 MW + 1×9,2 MW + 1×6,3 MW) din comuna Ciorani, judetul Prahova | PT+CS | Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord |
Sistem SCADA DMS incluzand 4 centre DMS si modernizarea a 21 stații de transformare: Stația IT/MT Azuga , Stația IT/MT Vega, Stația IT/MT Comarnic, Stația IT/MT Baltesti, Stația IT/MT Tatarani, Stația IT/MT Valea Voievozilor, Stația IT/MT IUP, Stația IT/MT Butimanu, Stația IT/MT Romlux, Stația IT/MT Valea Voievozilor, Stația IT/MT Hipodrom, Stația IT/MT Zatna, Stația IT/MT Lebada, Stația IT/MT Lunca, Stația IT/MT Tecuci, Stația IT/MT Uzina de Apa, Stația IT/MT Pechea, Stația IT/MT Beresti, Stația IT/MT Teis, Stația IT/MT Aninoasa, | PT+CS | Filiala de Distribuție a Energiei Electrice FDEE Electrica Distributie Muntenia Nord |
Proiectare și execuție lucrări electrice pentru evacuare putere din Parc Eolian Corni-70MW ( LES 110 kV, Stație transformare 110/30 kV, Rețea 30 kV Parc Eolian Corni) | PT +DE +Execuție +As Built | Global Wind Power / Vestas CEU |
Rețea de comunicatie FO (trei inele de fibra optica interconectate) | PT+DE | E.ON Moldova Distributie SA |
Sistem EMS/DMS-SCADA E.ON Moldova – Proiect Pilot Modernizarea a 25 IT/MT stații de transformare: Stația IT/MT Moinești, Stația IT/MT Vatra Dornei, Stația IT/MT Targu Neamț, Stația IT/MT Regie, Stația IT/MT Săveni, Stația IT/MT Pașcani, Stația IT/MT Delea, Stația IT/MT Rădăuți, Stația IT/MT Trușești, Stația IT/MT Izvoare, Stația IT/MT Solca, Stația IT/MT Dorohoi, Stația IT/MT Targu Ocna, Stația IT/MT Șișcani, Stația IT/MT Comănești | PT+DE+Execuție | E.ON Moldova Distribuție SA |